Detailed technical specifications for the Hybrid Battery Energy Storage System (HBESS) prototype

Result from all partners.

Result has been achieved on 30 April 2021 in month 5 of the project (results documented in Work Package 1 of the planned result: Hybrid Storage Systems and Use-cases: Specifications and requirements).

The detailed technical specifications for the Hybrid Battery Energy Storage System (HBESS) prototype have been defined based on the desired performance for on-grid operation. Using the top-down design approach, the requirements specified will be used to identify a specific design for all the related sub-systems of the HBESS. The technical specifications ensure that the overall design complies with the local and European standards. In practice, we will use the standards for the on-site installation in France. The selection of the proper system specifications is also based on the use-case scenarios that have been identified to test the prototype on a real electrical grid.

The picture below describes the working method of this result.